Formwork calculator, from the sizes on your schedule

For concrete and formwork contractors, builders and QSs who price shuttering by contact area from a column, footing or beam schedule. Pick the element, type in its sizes and how many there are, and the formwork area in m² goes straight into your takeoff - alongside everything you've measured on the drawing.

Watch: Formwork Calculator: Columns, Footings, Beams and Slab Edges in m²

What it works out, element by element

ElementWhat's formedArea, for one
Rectangular columnAll four sides2 × (length + width) × height
Round columnAround the circumferenceπ × diameter × height
Pad footingFour sides only - no base or top2 × (length + width) × depth
Strip footingBoth long sides. Ends optional, off by default2 × length × depth, plus 2 × width × depth with ends
BeamBoth sides and the soffit, over the clear span. Ends optional, off by default(2 × side depth + width) × span, plus 2 × width × side depth with ends
WallBoth faces. Ends optional, on by default2 × length × height, plus 2 × thickness × height with ends
Slab edgeEdge form around the perimeterperimeter × slab depth

Each area is multiplied by the quantity. All sizes are in metres.

Finishes, and lines that read like a bill

Choose the finish as you go - CESMM rough, fair or formwork left in, AS 3610 classes 1 to 5, or your own. The finish goes into the item name, so each one totals separately for pricing. Every result joins your takeoff as an m² item with its sizes written out, and goes into the CSV, Excel and PDF exports; zones work too, for totals per block or phase.

Worked example

  • 14 rectangular columns, 0.4 × 0.4 m, 4.2 m high: 2 × (0.4 + 0.4) × 4.2 = 6.72 m² each, × 14 = 94.08 m²
  • 2 pad footings, 1.2 × 1.2 m, 0.45 m deep: 2 × (1.2 + 1.2) × 0.45 = 2.16 m² each, × 2 = 4.32 m²

The columns' line in the takeoff reads: "Formwork to rectangular column, fair finish, 0.4 × 0.4 × 4.2 high × 14" - so anyone checking the quantities can see exactly what was measured.

What it doesn't do

It works out contact areas from the sizes you type in. It doesn't design formwork, count props or ties, or measure shapes off the drawing. Stairs, tapered sections and other complex shapes still need measuring by hand.

Try it on your own drawing

Measuring a drawing is free. The calculator is part of the paid plans: a £5.99 24-hour pass for a one-off job, or Pro at £14 a month or £110 a year (all plus VAT). See all plans.

Your drawings are processed in your browser and never uploaded to our servers - the calculator works there too.

Questions

Does a pad footing include the base?

No - only the four sides are formed. The base sits on the ground and the top is open, so neither is included.

When should I include ends?

Only where an end is actually formed. A strip footing or beam that runs into another footing, column or wall needs no stop-end, so ends are off by default; a free end (a cantilever, a lintel, a construction joint) needs one. Walls have ends on by default - untick them where the wall runs into another wall or column.

Can I record the finish?

Yes. Pick a CESMM finish (rough, fair, formwork left in), an AS 3610 class 1 to 5, or type your own. The finish goes into the item name, so each finish totals - and prices - as its own item.

Does it measure formwork off the drawing?

No. You type in the sizes from the schedule and the quantity; the calculator works out the contact area. It doesn't design formwork or count props and ties. Stairs, tapered sections and other complex shapes still need measuring by hand.

Is the formwork calculator free?

Measuring a drawing is free, but the formwork calculator is part of the paid plans: a £5.99 + VAT 24-hour pass for a one-off job, or Pro at £14 a month or £110 a year (plus VAT).