Drainage calculator: pipe runs, trench depths, bedding and reinstatement
For groundworkers, civils estimators and QSs pricing below-ground drainage. Working out a pipe run by hand means depths at each manhole, the depth bands in between, then the trench: what’s broken out, dug, bedded, surrounded, backfilled, reinstated and carted away. Trace the run on your drawing, type the four levels, and every one of those comes out at once.
Watch: Drainage Takeoff: Pipe Runs by Depth Band, Trench, Bedding and Reinstatement
How it works
- Choose Drainage run as the unit and name the run (e.g. Foul MH1-MH2).
- Click along the pipe from manhole wall to manhole wall - add points at any bends.
- Type the cover level and invert level at each end. Levels are taken as varying evenly between the two ends.
- Set the pipe (nominal bore, outside diameter and wall thickness), the trench width, the bedding, the surface and the backfill. These carry over to the next run, so on most jobs you only type the levels.
What you get for each run
| Item | Unit | How it’s worked out |
|---|---|---|
| Break out surface | m², and m³ to dispose of | Trench width (plus any extra cut-back each side) × length, at the thickness you give |
| Excavate | m³ | From under the broken-out surface to the bottom of the bed: depth to invert + pipe wall + bed |
| Pipe | m, by depth band | The run’s length, split by the depth from cover level to invert |
| Bed | m³ | Trench width × bed thickness × length |
| Surround or haunch | m³ | From the top of the bed to your height over the crown (or the springing), less the pipe |
| Backfill | m³ | From the top of the surround to the underside of the reinstatement - as dug or imported |
| Reinstatement | m² per layer | Each layer of your build-up, with its thickness in the item name |
| Muck away | m³ | Dug material that doesn’t go back in, with an optional bulking % |
In the exports every run’s lines go under shared “Drainage - …” items, so the same item is totalled across all your runs, with each run named in the description. The cover and invert levels are labelled on the marked-up drawing.
Depth bands
The built-in bands are CESMM’s, measured from the cover level to the invert:not exceeding 1.5 m, 1.5-2 m, 2-2.5 m, 2.5-3 m, 3-3.5 m, 3.5-4 m, exceeding 4 m. You can type your own. A run that goes from 1.3 m deep to 2.4 m deep is split into the length in each band it passes through, rather than priced at its average depth.
Bedding presets
| Preset | Bed | Above the bed |
|---|---|---|
| Class S - granular bed and surround | 100 mm | Surround to 300 mm over the crown |
| Class B - granular bed and haunch to springing | 100 mm | Haunch up to the springing (half the pipe) |
| Class F - granular bed | 100 mm | Nothing - bed only |
| Class N - flat bed of selected material | 100 mm | Nothing - bed only |
AS/NZS 2566.2 minimum embedment, by pipe outside diameter:
| Pipe OD up to | Bed | Side zone | Overlay above crown |
|---|---|---|---|
| 150 mm | 75 mm | 100 mm | 100 mm |
| 300 mm | 100 mm | 150 mm | 150 mm |
| 450 mm | 100 mm | 200 mm | 150 mm |
| 900 mm | 150 mm | 300 mm | 150 mm |
| 1500 mm | 150 mm | 350 mm | 200 mm |
The bed under the pipe is often increased in rock or soft ground, and adopting authorities and designers set their own details - every figure is editable, so use your spec’s. The trench width is always typed in; the panel shows the pipe OD + 300 mm as a guide only.
Surface presets
Starting points for the reinstatement layers - change any thickness, or add and remove layers:
- Tarmac: break out 100 mm; surface course 40 mm, binder course 60 mm, Type 1 sub-base 150 mm
- Block paviours: break out 80 mm; block paviours 50 mm, sand bedding 30 mm, Type 1 sub-base 150 mm
- Paving slabs: break out 50 mm; paving slabs 50 mm, mortar / sand bed 30 mm, Type 1 sub-base 100 mm
- Topsoil and seed (soft ground): topsoil 150 mm
For a road opening, an extra width each side widens the break-out and the layers within it, for a wider cut-back of the surface than the trench.
Worked example
The foul run from the demo video: MH1 to MH2, 60 m between manhole walls, in a road. Cover 52.40 and invert 51.10 at MH1 (1.30 m deep), cover 52.00 and invert 49.60 at MH2 (2.40 m deep). 150 mm uPVC pipe, 160 mm OD with a 4 mm wall; 0.6 m wide trench; Class S with a 100 mm bed and 300 mm over the crown. 80 mm of bituminous surface broken out, reinstated with 30 mm surface course, 50 mm binder course and 150 mm Type 1; backfilled with the dug material; 25% bulking on the muck away.
- Pipe by depth band: the depth goes from 1.30 m to 2.40 m over 60 m, so 10.91 m is not over 1.5 m deep, 27.27 m is 1.5-2 m and 21.82 m is 2-2.5 m.
- Break out: 0.6 × 60 = 36 m², with 36 × 0.08 = 2.88 m³ to dispose of.
- Excavate: average depth to the bottom of the bed 1.85 + 0.004 + 0.100 = 1.954 m; 0.6 × 1.954 × 60 = 70.34 m³, less the 2.88 m³ broken out = 67.46 m³.
- Bed: 0.6 × 0.1 × 60 = 3.60 m³.
- Surround: 0.6 × (0.16 + 0.3) × 60 = 16.56 m³, less the pipe (π × 0.08² × 60 = 1.21 m³) = 15.35 m³.
- Backfill as dug: average 1.954 - 0.56 of granular - 0.23 of build-up = 1.164 m; 0.6 × 1.164 × 60 = 41.90 m³.
- Reinstatement: 36 m² each of surface course, binder course and Type 1 (5.40 m³ of Type 1).
- Muck away: 67.46 dug - 41.90 back in = 25.56 m³ solid; with 25% bulking 31.95 m³.
What it doesn’t do (yet)
Manholes and chambers aren’t measured yet - count them separately. Each run has one surface and one trench width, so a run that crosses a road and then a garden is drawn as two runs. Pipe lengths are measured on plan (on a 60 m run at 1:40 the slope adds about 12 mm). Rock, trench support, dewatering and soft spots are for you to price on top.
Try it on your own drawing
Measuring a drawing is free. The calculator is part of the paid plans: a £5.99 24-hour pass for a one-off job, or Pro at £14 a month or £110 a year (all plus VAT). See all plans.
Your drawings are processed in your browser and never uploaded to our servers - the calculator works there too.
Questions
Is the depth band measured to the invert or to the bottom of the trench?
To the invert. The pipe length is split into depth bands by the depth from the cover level down to the pipe invert, as CESMM measures it - and the run is split into the length in each band, not averaged. The excavation itself goes down a pipe wall thickness and the bed further, to the bottom of the trench.
Where do the bedding figures come from?
The UK classes follow FP McCann’s pipe bedding guide (based on CPSA guidance): Class S is a granular bed and surround carried 300 mm over the crown, Class B a granular bed haunched to the springing, Class F a granular bed only, and Class N a flat bed of all-in or selected material. The bed under the pipe isn’t fixed there, so it starts at 100 mm. The AS/NZS 2566.2 preset uses that standard’s minimum embedment by pipe outside diameter. Every figure is editable - check them against your spec.
Can I use my own bedding and surface build-up?
Yes. The bed thickness and the surround above the crown are always yours to type, and you can choose bed only, bed and haunch, or bed and full surround. The reinstatement is a list of layers you can rename, resize, add to or remove - tarmac, block paviours, slabs, topsoil or your own. Your setup is remembered for the next run.
Does it measure manholes?
Not yet. Trace each run between the manhole walls; count the manholes, gullies and chambers with a Count measurement for now.
Are drainage runs free?
Measuring a drawing is free, but drainage runs are part of the paid plans: a £5.99 + VAT 24-hour pass for a one-off job, or Pro at £14 a month or £110 a year (plus VAT).